Click here to make tpub.com your Home Page

Page Title: Figure 6. Marking Control Line at 282 Inches.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 4. Tracing Lower Control Lines Down To Risers.
Up
TM-10-1670-327-23-P MC-6 Personnel Parachute System NSN 1670-01-527-7537 Manual
Next
Figure 8. Tying First Two Overhand Knots.

TM 10-1670-327-23&P
0005 00
1
1
2
Figure 6. Marking Control Line at 282 Inches.
8. Once the measurements are completed, route both lower control lines (left and right) to the center of
both left and right suspension line groups, ensure the lower control lines are free and clear and to the
inside of the suspension line groups.
9. Pass each lower control line (figure 7, item 1) through the two control line channels (located on the
inside of each rear riser) (figure 7, item 2), then through the guide ring (figure 7, item 3) and finally
through the wooden toggle (figure 7, item 4).
4
1
3
2
Figure 7. Routing Control Line Through Channel, Guide Ring, and Toggle.
10. Push the toggle (figure 8, item 1) up past the 282-inch mark (figure 8, item 2) and tie two overhand
knots (figure 8, item 3) on top of each other, below the toggle, such that the yellow mark (282-inch
mark) is located in the center of the first knot.
0005 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us