Click here to make tpub.com your Home Page

Page Title: SERVICE UPON RECEIPT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
OVERVIEW
Up
TM-10-1670-327-23-P MC-6 Personnel Parachute System NSN 1670-01-527-7537 Manual
Next
Marking Parachutes

TM 10-1670-327-23&P
UNIT MAINTENANCE
MC-6 PERSONNEL PARACHUTE SYSTEM
NSN 1670-01-527-7537
SERVICE UPON RECEIPT
INITIAL SETUP:
Tools
Personnel Required
Needle, Tacking (Item 32, WP 0097 00)
Two 92R (10) Parachute Riggers (during
Cradle, Deployment Bag Packing (Item 13, WP
positioning of control lines only).
Ballast, Bag, 14-lb (Item 6, WP 0097 00)
Ballast, Bag, 27-lb (Item 5, WP 0097 00)
Carabiner, Small (Item 9, WP 0097 00)
Tape Measure (Item 64, WP 0097 00)
Test Tube, Spring Compression (Item 67, WP
Tester, Spring, 0 to 80 lbs. (scale) (Item 66, WP
Materials/Parts
Equipment Condition
Tape Lacing And Tying, Nylon, A-A-52080-B-3
All equipment shall be serviceable and ready for
(Item 42, WP 0109 00)
use.
Cord, Nylon, Type III, (Item 18, WP 0109 00)
Cuff, Fabric (fabricated IAW WP 0113 00)
INITIAL RECEIPT
The following describes the procedures for processing parachutes upon initial receipt.
General Procedures for Air Delivery Equipment. When air delivery equipment is initially procured from
a supply source and issued to a using unit, the item(s) will be unpacked from the shipping container(s) and
inspected by a qualified parachute rigger (MOS 92R). The inspection performed will be a technical rigger-
type inspection and will be conducted as outlined in the Preventive Maintenance Checks and Services
(PMCS) procedures. Upon completion of the inspection, the item(s) will be tagged as prescribed in DA
PAM 738-751. Serviceable equipment may then be entered either into storage or into use in airdrop
operations, as applicable. An unserviceable item will be held and reported, in accordance with DA PAM
750-8.
Inspection Personnel. Personnel other than parachute rigger personnel may assist in the unpacking
process of initially received parachutes, as directed by the local air delivery equipment maintenance
officer. However, the maintenance officer will ensure the entire unpacking effort is conducted under the
direct supervision of a qualified rigger (MOS 92R).
Configuration Condition. Acceptance of new equipment from the manufacturer is based upon
inspections made of sample lots that have been randomly selected in accordance with military standards.
It is incumbent upon the using activity personnel to bear this in mind whenever equipment is first placed in
service. Changes will sometimes evolve from the original equipment design and sometimes contractors
are authorized deviations in material and construction techniques. Air delivery equipment that has been in
the field cannot be expected to meet exacting manufacturing specifications; however, the equipment
should closely reflect desired design characteristics. Since repairs, modifications, and/or changes can
alter or detract from the configuration originally desired, such equipment shall be airworthy, safe, of the
desired configuration, and adequate for intended use.