Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SHUT DOWN AFTER TESTING
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
DECALS AND INSTRUCTION PLATES
Up
TM-10-1670-305-23P Automatic Ripcord Release AR2 Model 451 NSN 1670-01-369-7914 Test Chanber Assembly AR2 Model 452 NSN 1670-01-370-0752 Manual
Next
TEST CHAMBER ASSEMBLY, MODEL 452 OPERATION UNDER UNUSUAL CONDITIONS (HIGH ALTITUDE FACILITES)

TM 10-1670-305-23&P 0010 00-15/16 Blank ELECTRONIC TEST CHAMBER ASSEMBLY, MODEL 453 0010  00 OPERATION UNDER USUAL CONDITIONS SHUT DOWN AFTER TESTING 1.     Verify that altitude chamber is at ground level.  If required, press DUMP switch (15). 2.     Open altitude chamber lid and remove AR2 from altitude chamber. 3.     Cocking support shall remain inside the altitude chamber.  Close altitude chamber lid. 4.     Switch test chamber ON/OFF switch (21) to OFF. 5.     Prepare AR2 for storage or shipment (WP 0023 00). PREPARATION FOR MOVEMENT 1.     If necessary, open altitude chamber lid and remove AR2. 2.     Prepare AR2 for storage or shipment (refer to WP 0023 00). 3.     Disconnect control assembly power cable from 110 VAC outlet.  Coil power cable behind vacuum pump/air compressor. WARNING The test chamber and carrying case weighs 60 lbs.  The test chamber weighs 42 lbs.  Use two persons or lifting device when moving or lifting to prevent injury to personnel. 4.     Install test chamber in carrying case.  Close and lock carrying case lid.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing