Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: GENERAL MAINTENANCE PROCEDURES CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
GENERAL MAINTENANCE PROCEDURES CONT.
Up
TM-10-1670-299-20P Ancillary Equipment fro Personnel Troop Parachute System Manual
Next
GENERAL MAINTENANCE PROCEDURES CONT.

TM 10-1670-299-20&P TO 14D1-2-470-2 NAVAIR 13-1-41 9    Check  the  engagement  of  the  installed  snap  fastener  components  with  the  opposite  mating components  with  the  opposite  mating  components  to  insure  the  open  and  closed  snapping  process  is  accomplished without hindrance.  If the snap engaging process cannot be accomplished without difficulty, replace the opposite mating snap fastener components using the procedures in steps 1 through 3, above. NOTE A durable snap fastener assembly will open and close from any direction.  A pull-the-dot snap fastener  assembly  will  open  and  close  from  only  one  direction.    A  pull-the-dot  snap  fastener assembly will open and close from only one direction. 10  As required, remove the chuck and die from the applicable snap fastener tools by reversing the procedures in step Z, above. (d)   Hand-   or   foot-operated   press   method.      Installation   of   durable   or   pull-the-dot   snap   fastener assemblies by hand- or foot-operated press can be accomplished by using the procedures in paragraph 1, above, except the chunk and die will be secured within the applicable press assembly using the available locking screws. (e) Installing a lift-the-dot snap fastener assembly. 1.  Hand-held method. (a) Using the specifics in Table 2-4, ascertain the size chuck and die required the fastener socket and clinch plate or stud and washer.  As applicable. (b) Place the selected chuck in the open end of the holder and secure the chuck in place using the locking screw located on one side of the holder.  Further, place the appropriate die into the anvil. (c) Fit the socket (with prongs facing down) or stud (with barrel facing down) on the lower end of the chuck.  Place the clinch plate or washer, as applicable, on the die. (d) Position the material over the clinch plate or washer, as applicable. (e) Aline the socket prongs with the pre-cut holes in the material or the barrel of the stud at the center of the material-covered washer, as applicable.  With an applied strike from a mallet,  clinch the two snap fastener components to the material. 2-37

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing