Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ANCILLARY EQUIPMENT FOR LOW VELOCITY AIR DROP SYSTEMS (LVADS) PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INTRODUCTION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
COMMON TOOLS AND EQUIPMENT
Up
TM-10-1670-296-20P Ancillary Equipment for Low Velocity Air Drop System (LVADS) Manual
Next
Intervals

                                                                   TM 10-1670-296-20&P                                                    0004 00 ANCILLARY EQUIPMENT FOR LOW VELOCITY AIR DROP SYSTEMS (LVADS) PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INTRODUCTION 0004 00-1 GENERAL The following describe PMCS procedures on the unit support levels.  The PMCS table has been provided to ensure the ancillary equipment is in proper operating condition, and ready for its primary mission. Be sure to perform your PMCS each time you use the equipment.  Always do your PMCS in the same order, so it gets to be a habit.  Once you’ve had some practice, you’ll quickly spot anything wrong. Do your BEFORE (B) PMCS just before you use the equipment.  Pay attention to WARNINGs, CAUTIONs, and NOTEs. Do your DURING (D) PMCS while you use the equipment.  During operation means to check the equipment and its related components while it is being used.  Pay attention to WARNINGs, CAUTIONs and NOTEs. Do your AFTER (A) PMCS right after using the equipment.  Pay attention to WARNINGs, CAUTIONs and NOTEs. Do your WEEKLY (W) PMCS once a week. Do your MONTHLY (M) PMCS once a month. Use DA Form 2404 (Equipment Inspection and Maintenance Worksheet) to record any faults that you discover before, during, or after operation, unless you can fix them.  You DO NOT need to record faults that you fix. Frequency of Performing PMCS.  PMCS will be performed before equipment is rigged for use, during modification and repair, after use, or at any time deemed necessary by the air delivery equipment maintenance officer. PMCS Columnar Entries Table 1.  Enter data in columns as follows: Item number.  The item number column shall be used as a source of the item number required for the TM Number column on DA Form 2404 (Equipment Inspection and Maintenance Worksheet), when recording the results of the PMCS. Interval.  This column identifies the required PMCS interval. Item to be inspected.  Contains the common name of the item to be inspected. Procedures.  Provides a brief description of the procedures by which the checks are to be performed. The items are listed consecutively and the numbers indicate the sequence of minimum inspection requirements.  The types and intervals of inspection required for the platform are as follows: Routine inspection:  Before and after operation. Technical/Rigger-type Inspection:  Before rigging, and before and after maintenance. Item Number.  Item numbers (ITEM No.) shall be assigned to the PMCS procedures.  The PMCS procedures shall be arranged in a logical sequence requiring minimum time and motion on the part of the person(s) performing them and shall be so arranged that there will be minimum interference between persons performing the checks simultaneously on the same end item.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing