Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Modification Work Order (MWO) Compliance Record Page
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Accomplishing a Log Record cont.
Up
TM-10-1670-296-20P Ancillary Equipment for Low Velocity Air Drop System (LVADS) Manual
Next
Accomplishing a Log Record cont.

                                                                   TM 10-1670-296-20&P                                            0003 00 0003 00-6 3.    Modification Work Order (MWO) Compliance Record Page.  When a modification is performed on an item, the following entries will be made on the “Modification Work Order Compliance Record” pages of the Log Record. a.    MWO Number.  Enter publication number and date of Modification Work Order (MWO) that describes MWO (Item 1, Illustration on following page). b.    MWO Title.  Enter a short, abbreviated title extracted from the MWO prescribing the work. c.     Modified By.  Enter the last name of the individual who has performed the modification.  If the original log record for the item has been lost, and it has been ascertained through inspection that a particular modification has been accomplished, the entry for this column will be C/W, COMPLIED WITH (Item 2, Illustration below), which signifies the applicable MWO has been complied with. d.    Inspected By.  The individual who accomplished the inspection required after modification will sign this entry with their last name only. e.    Unit.  Enter the unit designation responsible for performing the MWO or in the event of a lost Log Record, the unit to which the inspector is assigned. f. Date.  Enter the date (day, month, and year) the modification work was completed. 4.    Unit and Direct Support Repair and Inspection Data.  When an item is initially received from a supply source and a technical/rigger-type inspection is performed, the inspection accomplishment will be documented on the “Unit and Intermediate Repair and Inspection Data” page of the individual Parachute Log Record.  Additional entries will also be made on this page each time the item is repaired or is administered an inspection in compliance with a Maintenance Advisory Message (MAM) or Ground Precautionary Message (GPM).  The page completion criteria is as follows: a.    Type of Repair.  Enter the type of repair, completion of initial inspection, repair accomplishment, or MAM or GPM compliance.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing