Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ANCILLARY EQUIPMENT FOR LOW VELOCITY AIR DROP SYSTEMS (LVADS) SERVICE UPON RECEIPT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
CHAPTER 2 OPERATOR MAINTENANCE INSTRUCTIONS   FOR ANCILLARY EQUIPMENT FOR LOW VELOCITY AIR DROP SYSTEMS (LVADS)
Up
TM-10-1670-296-20P Ancillary Equipment for Low Velocity Air Drop System (LVADS) Manual
Next
Checking Unpacked Equipment

                                                                   TM 10-1670-296-20&P                                            0003 00 ANCILLARY EQUIPMENT FOR LOW VELOCITY AIR DROP SYSTEMS (LVADS) SERVICE UPON RECEIPT 0003 00-1 THIS TASK COVERS: Overview Initial Receipt Common Tools and Equipment Special Tools and Equipment Repair Parts INITIAL SETUP: Personnel Required 92R (10) Parachute Rigger Equipment Condition All equipment shall be serviceable and ready for use. OVERVIEW This chapter contains information necessary to maintain the ancillary equipment for the Low Velocity Air Drop System at the unit maintenance level, in accordance with the Maintenance Allocation Chart (MAC) for the equipment.  It includes the following: 1.    Procedures for processing new or used ancillary equipment upon receipt. 2.    Assembly of components prior to rigging. 3.    Preventive maintenance procedures to ensure continued serviceability of all components. 4.    As required inspections and maintenance procedures performed prior to assembly/rigging. 5.    Detailed assembly procedures. 6.    Repair methods and repair, or replacement, procedures for all components of the ancillary equipment are listed and illustrated in the unit maintenance procedures of this manual, WP 0007 00 through WP 0060 00. INITIAL RECEIPT The following describes the procedures for processing ancillary equipment upon initial receipt. General Procedures for Air Delivery Equipment.  When any of the LVADS Ancillary Equipment is initially received from a supply source and issued to a using unit, the items will be unpacked from the shipping containers and inspected by a qualified parachute rigger.  The inspection performed will be a technical/rigger-type inspection that will be conducted as authorized in WP 0007 00, INSPECTION.  Upon completion of the inspection, the items will be tagged as prescribed in DA PAM 738-751.  Serviceable equipment may then be entered either into storage or into use in airdrop operations, as applicable.  An unserviceable item will be held and reported in accordance with WP 0007 00, INSPECTION.   Inspection Personnel.  Personnel other than parachute rigger personnel may assist in the unpacking process of initially received components, as directed by the local air delivery equipment maintenance officer.  However, the maintenance officer will ensure the entire unpacking effort is conducted under the direct supervision of a qualified parachute rigger (MOS 92R). Remember that acceptance of new airdrop equipment from manufacturers is based upon inspections made of sample lots that have been randomly selected in accordance with military standards.   

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing