Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Heavy-Duty Link Assembly
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
M-2 Cargo Parachute Release
Up
TM-10-1670-296-20P Ancillary Equipment for Low Velocity Air Drop System (LVADS) Manual
Next
Type IV Link Cover

TM 10-1670-296-20&P                                                       0002 00 0002 00-6 Heavy-Duty Link Assembly.  The heavy-duty link assembly (1) is assembled as required using two 3 ¾- or 5 ½-inch (9.5 or 14.0-m) side plates (2).  They use spacer, sleeve, small (3) and large sleeve spacer (4), as required, and are secured with bolts (5) and nuts (6).  Assemblies (also called two-point links) are used to join extraction lines to LVADS platform.  The length used is determined by the load being rigged. 4-Point Link.  The four-point link, also called the arm clustering assembly, provides for two extraction parachutes to be connected to the extraction line.  It consists of two aluminum alloy side plates (1), and four bolts (2) with aluminum sleeves (3), four hexagon nuts (4), and a loop spacer (5). 1

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing