Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-28. Suspension Lines Prepared for Rollup
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-27.  Suspension Line Stow Complete
Up
TM-10-1670-294-23P Parachute Cargo Type: 35-Foot Diameter Ribbon Extraction Parachute NSN 1670-01-283-4031 Manual
Next
Figure 2-30.  Temporary Bag Closing Tie

ARMY TM 10-1670-294-23&P AIR FORCE T.O. 13C5-33-2 NAVY NAVAIR 13-1-34 o. Closing Deployment Bag (1) Lift deployment bag and stand on end. (2) Lay bag on floor with mouth of bag and stowed suspension lines toward tension device. (3) Position  the  taped  suspension  line  connector  links  in  the  upper  center  of  the  stowage  panel next  to  the  canopy  skirt.    Insure  that  the  adapter  web  extends  from  the  left  side  of  the  bag (figure 2-28). Figure 2-28.  Suspension Lines Prepared for Rollup. (4) Tightly roll the suspension line stowage panel while lifting the bag to upright position and tuck into the mouth of the deployment bag (figure 2-29). (5) Fold  the  adapter  web  lengthwise  from  left  to  right  across  the  rolled  suspension  line  stowage panel. (6) Use a suitable length of 1/4-inch cotton webbing, Install a temporary bag closing tie (hourglass tie) using the four bag closing loops.  Secure with a surgeon's knot and a locking knot (figure 2- 30). 2-41

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing