Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-4. Log Record Entries for the Modification Work Order Compliance Record Page
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-3.  Inside Back Cover of Parachute Log Record
Up
TM-10-1670-294-23P Parachute Cargo Type: 35-Foot Diameter Ribbon Extraction Parachute NSN 1670-01-283-4031 Manual
Next
Receipt of Used Parachute

ARMY TM 10-1670-294-23&P AIR FORCE T.O.  13C5-33-2 NAVY NAVAIR 13-1-34 (a)  MWO  number.    Enter  the  publication  number  and  date  of  the  Modification  Work  Order  (MWO)  which describes the MWO (1, figure 2-4). (b) MWO title.  Enter a short, abbreviated title extracted from the MWO prescribing the work. (c) Modified by.  Enter the last name of the individual who has performed the modification.  If the original log record  for  the  parachute  has  been  lost,  and  it  has  been  ascertained  through  inspection  that  a  particular modification  has  been  accomplished,  the  entry  for  this-column  will  be  C/W  "Complied  With"  (2,  figure  2-4), which signifies the applicable MWO has been complied with. (d) Inspected by.   The individual who accomplished the inspection required after modification will sign this entry with last name only. Figure 2-4.  Log Record Entries for the Modification Work Order Compliance Record Page. (e)  Unit.    Enter  the  unit  designation  responsible  for  performing  the  MWO  or  in  the  event  of  a  lost  Log Record, the unit to which the inspector is assigned. (f) Date.  Enter the date (day, month, and year) the modification work was completed. (4)  Unit  and  intermediate  DS  repair  and  inspection  data.    When  a  parachute  canopy  assembly  is  initially received    from    a    supply    source    and    a    technical/rigger-type    inspection    is    performed,    the    inspection accomplishment  will  be  documented  on  the  "Unit  and  Intermediate  Repair  and  Inspection  Data"  page  of  the individual Parachute Log Record (figure 2-5).  Additional entries will also be made on this-page each time the canopy   assembly   is   repaired   or   is   administered   an   inspection   in   compliance   with   a   one-time   inspection Technical Bulletin (TB).  The page completion criteria is as follows: (a) Type of repair Enter the type of repair, completion of initial inspection, repair accomplishment, Technical Bulletin Inspection compliance. (b) Inspection by.  The individual who accomplished the inspection required will sign this entry with last name. (c) Unit.  Enter the unit designation responsible for performing the type of repair. (d) Date.  Enter the day, month and year the repair was performed. 2-6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing