Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: UNIT MAINTENANCE T-10C/T-10D TROOP BACK PARACHUTE ASSEMBLY PACKING PROCEDURES CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
UNIT MAINTENANCE T-10C/T-10D TROOP BACK PARACHUTE ASSEMBLY   PACKING PROCEDURES
Up
TM-10-1670-293-23P Parachute Personnel Type: 35-Foot Diameter T-10C Troop Back Parachute Assembly NSN 1670-01-248-9502 Manual
Next
UNIT MAINTENANCE T-10C/T-10D TROOP BACK PARACHUTE ASSEMBLY PACKING PROCEDURES CONT.

TM 10-1670-293-23&P    0011 00 Change 1 0011 00-2 NOTE   Once the USL and USL extension has been used in a parachute deployment from an aircraft, the webbing while under tension will stretch, therefore never returning to its original manufactured dimension.  That original manufactured dimension is what determines the static line length serviceability at the in-service inspection. NOTE For the USL, when laying out the static line to form the girth hitch, ensure the green ID marking thread of the webbing is on the top. 1.    Attaching the USL to the deployment bag.    a.    Position the deployment bag with the stow loops facing up and pass the 6-inch buffer loop of the USL clockwise, halfway through the deployment bag reinforcement webbing.    b.    Pass the 3½-inch loop end of the USL through the 6-inch buffer loop, counterclockwise, until a taut girth-hitch is formed.  

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing