Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: RECEIPT OF USED PARACHUTE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Modification Work Order (MWO) Compliance Record Page Cont.
Up
TM-10-1670-293-23P Parachute Personnel Type: 35-Foot Diameter T-10C Troop Back Parachute Assembly NSN 1670-01-248-9502 Manual
Next
T-10C/T-10D TROOP BACK PARACHUTE ASSEMBLY ASSEMBLING THE T-10C/T-10D TROOP BACK PARACHUTE

TM 10-1670-293-23&P   0003 00 0003 00-9/(10 Blank) 7.     Replacing a lost log record. NOTE Any time a log record is discovered missing from a parachute, a replacement log record will be initiated during repack or inspection, as applicable. a.     Using a suitable blue or black marking device, enter NEW BOOK at the top of the inside front cover of the replacement log record. b.     Accomplish the log record inside front cover as prescribed above. c.     The age life of the canopy will be obtained from the date placed in service (initial) and other applicable data on the Jump, Inspection, and Repack Data page of the log record, as detailed above.  Enter IN, if date placed in service is known.  If not known, enter UNK. d.     If it can be ascertained by inspection that a previous MWO or TB has been complied with, applicable entries will be made on the appropriate page of the replacement log record. e.     Attach the replacement log record to the log record/inspection data pocket using the procedures above. RECEIPT OF USED PARACHUTE Upon initial receipt of used parachute, proceed as follows: 1.     Follow procedures given in the  General Procedures for Air Delivery Equipment paragraph, above, and check each component for excessive wear and tear. 2.     If defects or damages are discovered, process the parachute for maintenance at the maintenance level assigned by the MAC, WP 0039 00. AFTER-USE RECEIPT When a parachute is received at the maintenance activity, following its use by the parachutist during air delivery, it must be given a shakeout and aired (WP 0007 00), and if necessary, cleaned (WP 0008 00) before it can be returned to service.  If a parachute is issued but is not used, it does not need to be given a shakeout; however, it must be given a routine inspection by a qualified parachute rigger. END OF WORK PACKAGE

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing