Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ATTACHMENT OF CONTROL TOGGLES TO CONTROL LINES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
ATTACHMENT OF CANOPY TO RISERS CONT.
Up
TM-10-1670-287-23P MC-4 RAM Air Free-Fall Personnel Parachute System NSN 1670-01-306-2100 Manual
Next
CANOPY TRIM CHECK

TM 10-1670-287-23&P 0006 00 0006 00-13 ATTACHMENT OF CONTROL TOGGLES TO CONTROL LINES Attach control lines to control toggles as follows: 1.    Pass control lines through guide rings on rear risers, and then through rings on control toggles. 2.    Temporarily secure control lines to rings with a loose overhand knot against toggle ring. NOTE Final adjustment will be made during full-flight trim check (WP 0006 00). ATTACHMENT OF PILOT CHUTE, BRIDLE LINE, AND DEPLOYMENT BAG   Attach pilot chute, bridle line, and deployment bag as follows: 1.    Pass bridle line loop at ring end through deployment bag top grommet from outside to inside. 2.    Pass bridle line loop at ring end completely through bridle line attachment ring on top of canopy. 3.    Pass opposite end of bridle line and deployment bag through loop at end ring.  Pull tight forming a girth hitch. 4.    Pass other loop end of bridle line through 1-inch loop at bottom end of pilot chute. Upper Guide Ring Control Line Lower Guide Ring Toggle Ring Overhand Knot

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing