Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION OF SAFETY STOW; ELASTIC LOOP IN DEPLOYMENT BAG
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
APPLICATION OF MARKINGS
Up
TM-10-1670-287-23P MC-4 RAM Air Free-Fall Personnel Parachute System NSN 1670-01-306-2100 Manual
Next
INSTALLATION OF SAFETY STOW; ELASTIC LOOP IN DEPLOYMENT BAG CONT.

TM 10-1670-287-23&P                                                 0005 00 0005 00-10 INSTALLATION OF SAFETY STOW; ELASTIC LOOP IN DEPLOYMENT BAG Install safety stow elastic loop in deployment bag as follows: CAUTION Do not tack elastic loop to deployment bag.  Safety stow elastic loop must move freely within guide channel. 1.    Insert elastic loop in channel.  Center loop splice between grommets. 2.    Route each loop end through appropriate grommet. ATTACHMENT OF CONTROL LINES TO CONTROL TOGGLES Attach control lines to control toggles as follows: 1.    Pass control line through guide ring on rear riser, and the through ring on control toggle. Control Line Tacking Guide Ring Ring Toggle Safety Stow Loops Rear Riser

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing