Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: APPLICATION OF MARKINGS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
ATTACHMENT OF CANOPY TO RISERS CONT.
Up
TM-10-1670-287-23P MC-4 RAM Air Free-Fall Personnel Parachute System NSN 1670-01-306-2100 Manual
Next
INSTALLATION OF SAFETY STOW; ELASTIC LOOP IN DEPLOYMENT BAG

TM 10-1670-287-23&P                                                 0005 00 0005 00-9 6.    Hand-tack each riser below the connector link with one turn double, tape lacing and tying, and with an overhand knot. 7.    Remove parachute from suspension device and place in proper layout. APPLICATION OF MARKINGS Apply markings as follows: NOTE When a parachute component is placed in service, the month and year of date placed in service shall be marked on it. 1.    Canopy.  On cell with data block. 2.    Harness/container.  On left diagonal back strap near the data label. 3.    Pilot chute assembly.  Anywhere on fabric area that will be visible after marking. 4.    Slider.  Anywhere on fabric area that will be visible after marking. 5.    Risers.  Stencil riser on fabric, in suitable location (near data tag). 6.    Allow marking to dry 20 to 30-minutes. Connector Link Tacking Riser

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing