Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: EXTRACTION LINE PANEL STOWING 140-FOOT THREE LOOP EXTRACTION LINE TO EXTRACTION LINE PANEL
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 7.  Extraction Line Bag Closed
Up
TM-10-1670-286-20 Extraction Line Panel NSN 1670-01-183-2678 Manual
Next
Figure 1.  Two Panel Layout for Stowing 140-FT Three Loop   Extraction Line

TM 10-1670-286-20 EXTRACTION LINE PANEL                                                                                                                          0009 00 STOWING 140-FOOT THREE LOOP EXTRACTION LINE TO EXTRACTION LINE PANEL 0009 00-1 THIS SECTION COVERS: Stowing   INITIAL SETUP Tools Knife – NSN 5110-00-162-2205 Materials/Parts (2)       Extraction Line Panels – NSN 1670-01-183-2678 Extraction Line, 140-FT, Three Loop – NSN 1670-01-107-7651 Band, Rubber, Retainer – Item 1, Appendix C Cloth, Muslin-Cotton – Item 4, Appendix C Webbing, Cotton, Type I – Item 16, Appendix C Webbing, Nylon, Tubular – Item 17, Appendix C Personnel Required     92R (10) Parachute Rigger Equipment Condition All equipment shall be serviceable and ready for use.      References      WP 0002 00-2 Extraction Line Panel      WP 0003 00   Service and Repair      TM 10-1670-296-20&P Extraction Line STOWING NOTE Throughout    this    task    the    terms    Right,    Left,    Upper,    Lower, Clockwise, Counterclockwise, Top and Bottom indicate directions, as viewed by the Rigger, standing at the Tension Board end of a parachute pack table looking toward the apex end.   When  “two  Extraction  Line  Panels”  are  laced  together,  the  item then takes the noun nomenclature of Extraction Line Bag.   Load attaching end of the Extraction Line Bag is laced closed with ½-inch tubular nylon webbing.     1.  Layout           a.  Position two Extraction Line Panel on pack table or suitable surface with stow loops facing up and           running lengthwise (figure 1).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing