|
| |
Back PMCS Procedures. | Up TM-10-1670-282-23P Parachute Cargo Type: 34-Foot Diameter Model G-14 Low-Velocity Cargo Parachute NSN 1670-00-999-2608 Manual | Next Section V. UNIT AND INTERMEDIATE DIRECT SUPPORT (DS) MAINTENANCE PROCEDURES |
ARMY TM 10-1670-282-23&P
AIR FORCE T.O. 13CS-3G-2
NAVY NAVAIR 13-1-33
Table 2-1. Unit and Intermediate Direct Support (DS) Preventive Maintenance Checks and Services (PMCS).
B-Before
D-During
A-After
INTERVAL
ITEM
ITEM TO BE
PROCEDURES
NO.
B
D
A
INSPECTED
NOTE
Any defective material noted must be repaired prior
to use.
G-14 34-Foot Cargo
Parachute
1
·
Parachute Packed for Use
Visually check visible parts for serviceability and
completeness without opening pack. Check parachute
inspection data record for pack date.
2
·
·
Canopy
As canopy is raised, lowered, and suspended during
shakeout, check for dampness, fungus, acid, grease, oil,
dirt, foreign material, holes, cuts, tears; broken lines and
webbing.
·
·
Fabric Materials
Legibility of data markings; completeness; dampness,
fungus, dirt, acid, grease, oil, foreign material, rips, burns,
cuts, breaks, frays, tears, holes, thin spots, loose weaving;
loose or broken stitching, lines, or webbing.
·
·
Hardware Components
Riser clevis assemblies for corrosion, rough spots, burrs,
breaks, cracks, bends; missing tie cord, clevis pin or
safety pin.
3
·
·
Pack, Static Line, and
Completeness; dampness, fungus, acid, grease, oil, dirt,
Drogue
foreign material, holes, cuts, and breaks.
·
·
Fabric Materials
Completeness; dampness, fungus, dirt, acid, grease, oil,
foreign material, rips, burns, cuts, breaks, frays, tears,
holes; loose or broken stitching.
·
·
Hardware Components
Clevis assembly for corrosion, rough spots, breaks,
cracks, bends; missing tie cord, pin, and safety pin.
2-10
|