Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: PMCS Procedures.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Checking Unpacked Equipment After Shipment
Up
TM-10-1670-282-23P Parachute Cargo Type: 34-Foot Diameter Model G-14 Low-Velocity Cargo Parachute NSN 1670-00-999-2608 Manual
Next
Table 2-1.  Unit and Intermediate Direct Support (DS) Preventive Maintenance Checks and Services (PMCS)

ARMY TM 10-1670-282-23&P AIR FORCE TO.  13C5302 NAVY NAVAIR 13-1-33 (4) Procedures.  Provides a brief description of the procedure by which the checks are to be performed. d. Recording Defects.  All defects discovered during the inspection will be recorded using the applicable specifics In DA PAM 738-750, DA PAM 738-751, and TB 43-0002-43, Maintenance Expenditure Limits for FSC Group 1670. e. Overage Items.  During any inspection or at any time that an item is found to be overage (shelf/service life has expired as specified in TB 43-0002-43), the item will be removed from service, condemned and tagged in accordance with DA PAM 738-751. f. Conservation of Resources.  To conserve time and labor, and to avoid evacuation to an intermediate maintenance activity, unit/detachment commanders may designate, in writing, rigger personnel to accomplish classification inspection of overage air delivery equipment. g. Inspection Function Requirement.  Normally, a technical/rigger-type inspection will be performed by air delivery equipment maintenance personnel at a packing, rigging, or repair activity.  The inspection of initial receipt items will be performed as a separate function from packing or rigging activity; the Hem to be inspected will be placed in proper layout on packing surface or suitable sized floor area.  Should defect or damage be discovered at any point during the inspection, the inspection will be terminated and the applicable item will be processed and forwarded to repair activity.  The repair activity, in turn, will conduct a technical/rigger-type inspection that will be performed by only those parachute rigger personnel cited in AR 750-32 Air Delivery, Parachute Recovery and Aircraft Personnel Ejection System.  Any defect discovered during a unit level repair activity inspection which exceeds the capability of that activity will require the affected area to be evacuated to an Intermediate maintenance function for further determination of economic repair and repair accomplishment, if applicable. NOTE Parachutes which are deemed unserviceable by a packing or rigging activity will be rigger-rolled prior to being sent to a repair activity. 2-9

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing