Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Initial Receipt
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Special Tools, TMDE and Support Equipment
Up
TM-10-1670-281-23P Parachute Cargo Type: 64-Foot Diameter Model G-12D NSN 1670-00-893-2371 and Model G-12E NSN 1670-01-060-3705 Manual
Next
Figure 2-1.  Installing Attachment Tie on Parachute Log Record

ARMY TM 10-1670-281-23&P AIR FORCE T.O. 13C5-32-2 NAVY NAVAIR 13-1-32 removed or separated from a parachute, and especially a packed parachute, except as directed by the local air delivery  equipment  maintenance  activity  officer.  A  log  record  which  is  illegible,  lost,  damaged,  soiled,  or precludes further entries due to lack of space will be replaced upon the next repack or inspection, as applicable, with a serviceable item from stock. e.  Installing Attaching Tie.  Install attaching tie as follows: (1)  Cut a 30-inch length of ticket No.  5 waxed cotton thread and double the thread length. (2)  Pass the looped end of the double thread length around the centerfold of the log record and form a sliploop on the outside at the log record top (A, figure 2-1). (3)  Pass the thread length running ends through the comer attaching hole from the front cover of the log record  (B,  figure  2-1)  and  insure  the  running  ends  are  routed  over  that  part  of  the  thread  length located along the log record centerfold (C, figure 2-1). (4)  Complete the attachment tie by making a half hitch on top of the slip loop made in (2), above. (5)  Thread one running end of the log record attachment tie (D, figure 2-1) in a tacking needle and pass the tacking needle with attached thread end through the edge binding of the applicable parachute log record/inspection data pocket. (6)  Remove the thread end from the tacking needle and make a finished 10-inch-long record attaching loop by securing the two thread together with an overhand knot. (7)  Insert the log record into the pocket and secure the record within the pocket using the pocket flap and applicable type flap fastener. 2-3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing