Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Tying the canopy assembly cont.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Tying the canopy assembly cont.
Up
TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Next
Tying the canopy assembly cont.

TM 10-1670-280-23&P                                                       0011 00 0011 00-23 c.     Connector link assemblies. (1)    Release the strap fastener on the webbing strap threaded through the connector link assemblies and tape a 24-inch length of ¼-inch wide, type I cotton webbing to the running end of the strap. (2)    Remove the webbing strap from the connector link assemblies that, in turn, will pull the taped webbing through the connector link assemblies.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing