|
| |
Back Tying the canopy assembly | Up TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual | Next Tying the canopy assembly cont. |
TM 10-1670-280-23&P 0011 00
0011 00-22
(5) Beginning at a point 10-feet below the skirt band (lower lateral band) and at 10-foot intervals
thereafter, tie both suspension line groups and center line together using one turn single, ticket
No. 8/4 cotton orange thread at each point. Secure each tie with a surgeons knot and locking
knot. Make the last tie 5-feet above the connector link assemblies. Trim all tie ends to 2-inches.
|