Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Completing center line installation cont.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Completing center line installation cont.
Up
TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Next
Tying the canopy assembly

TM 10-1670-280-23&P                                                       0011 00 0011 00-20 CAUTION If any portion of the center line attachment at the screw pin clevis and vent line apex falls at, or below, the lower lateral band of the canopy, then the center line is too short.  The center line must be replaced with a center line having a minimum length of 97-feet, 0-inches. g.    One packer will pull the center line free end toward the risers, one of the other packers will guide the canopy vent, keeping it in the air channel between lines 1 and 120, ensuring that the canopy material does not become disarranged while the canopy vent is being pulled toward the canopy skirt. h.    Remove the right suspension riser from the large suspension clevis and place the center line free end on the clevis.  Using masking tape, secure the risers and center line together at a point immediately above the attaching loops. i. Using a suitable marking aid, mark each riser (riser 1, 5, 9) and center line for identification purposes. j. Rigger check number 2. NOTE Ensure all ties are tight.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing