Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Completing center line installation cont.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Completing center line installation
Up
TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Next
Completing center line installation cont.

TM 10-1670-280-23&P                                                       0011 00 0011 00-19 b.    Grasp the vent lines, with the bridle loop positioned to one side, and place the screw pin shackle over the vent lines. c.     Rotate the vent lines down over the shackle legs to form a girth hitch. d.    Disconnect the center line from the bridle loop.  While installing the screw pin, place the end loop of the center line on the screw pin. e.    Tighten the screw pin and pull the girth hitch until tight. f. Using 2-inch pressure sensitive adhesive tape, tape the shackle, vent line loop and center line loop so that no metal parts, splice ends or rough webbing ends are exposed.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing