Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Folding the gores and reefing the canopy
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Folding the gores and reefing the canopy cont.
Up
TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Next
Folding the gores and reefing the canopy

TM 10-1670-280-23&P                                                       0011 00 0011 00-15 g.    Beginning with line 62, one packer passes each line in the right group to a second packer who threads the right running end of the reefing line through each reefing ring.  After each reefing ring is threaded, the second packer will use a leg to guide the suspension line into the right slot of the line separator.  Continue the gore folding process until lines 61 through 90 are reefed and in the right slot of the line separator and the gores between each line are folded. h.    Stop the gore folding and from right to left, pass the end of the reefing line through the reefing line cutter at line 91 and pull 6-inches through. i. Pass one end of the second reefing line, from left to right, through the hole in the reefing line cutter at line 91 and pull 6-inches through. j. Secure the two reefing line ends together over the reefing line cutter at line 91 with a surgeon’s knot and locking knot.  Make an overhand knot in each running end.  Trim each tie end at a point 2-inches from the surgeon’s knot and locking knot.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing