Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Folding the gores and reefing the canopy cont.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Folding the gores and reefing the canopy
Up
TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Next
Folding the gores and reefing the canopy

TM 10-1670-280-23&P                                                       0011 00 0011 00-14 e.    Using the 6-inch length of the reefing line, make a slip-knot immediately to the right of the reefing line cutter to secure the reefing line during the reefing process. f. Position a large pedestal fan at a point 10-feet below the canopy skirt.  Position the fan so the air stream will partially inflate the canopy.    CAUTION Failure to evenly distribute the reefing line between each reefing ring will cause a delay in the parachute deployment, an uneven inflation of the canopy or result in a malfunction.    NOTE A packer will take a position near the apex of the canopy and observe the canopy during the reefing process.  If canopy damage is observed the reefing process will be stopped and the parachute will be processed for maintenance.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing