|
| |
Back Folding the gores and reefing the canopy | Up TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual | Next Folding the gores and reefing the canopy |
TM 10-1670-280-23&P 0011 00
0011 00-14
e. Using the 6-inch length of the reefing line, make a slip-knot immediately to the right of the reefing line
cutter to secure the reefing line during the reefing process.
f.
Position a large pedestal fan at a point 10-feet below the canopy skirt. Position the fan so the air
stream will partially inflate the canopy.
CAUTION
Failure to evenly distribute the reefing line between each reefing ring will
cause a delay in the parachute deployment, an uneven inflation of the
canopy or result in a malfunction.
NOTE
A packer will take a position near the apex of the canopy and observe
the canopy during the reefing process. If canopy damage is observed
the reefing process will be stopped and the parachute will be processed
for maintenance.
|