Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Folding the gores and reefing the canopy
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Applying tension
Up
TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Next
Folding the gores and reefing the canopy cont.

TM 10-1670-280-23&P                                                       0011 00 0011 00-13 a.    At a suitable point below the canopy skirt (lower lateral band), position a large line separator between the two groups of suspension lines.  Insert line 61 into the right slot. b.    While holding line 61 in position in the line separator, pick up the right suspension line group and throw the right group of gores and lines over the left group of gores and lines. c.     Cut four 16 ½-foot lengths of ½-inch wide tubular nylon webbing and tape 2-inches of the ends of each webbing length with masking tape. d.    Rotate the reefing line cutter at line 61 upward and pass one end of a 16 ½-foot reefing line from left to right through the hole in the reefing line cutter.  Pull 6-inches of the reefing line through cutter.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing