Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Applying tension
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Attaching the center line cont.
Up
TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Next
Folding the gores and reefing the canopy

TM 10-1670-280-23&P                                                       0011 00 0011 00-12 e.    Insert the ¼-inch screw with serrated lock-washer through the hole on the bottom of the bracket, into the threaded hole in the bottom end of the cutter and tighten the screw finger tight.   NOTE A four-line check for proper layout shall be performed before applying tension. f. Rigger check number 1. 5.    Applying tension.  Attach the nylon webbing strap routed through the connector links to a tension device and apply tension.    NOTE A tension jack, chain hoist, power winch, or a vehicle may be used as a tension device when applying tension to the parachute. 6.    Folding the gores and reefing the canopy.  Fold the canopy gores into two groups of 60 gores each and thread the reefing line through the canopy reefing rings as follows:

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing