Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: UNIT MAINTENANCE 100-FOOT DIAMETER CARGO PARACHUTE SHAKEOUT AND AIRING
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Table 1.  Preventive Maintenance Checks and Services (PMCS) -Continued
Up
TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Next
UNIT MAINTENANCE 100-FOOT DIAMETER CARGO PARACHUTE SHAKEOUT AND AIRING CONT.

TM 10-1670-280-23&P                                                       0007 00 UNIT MAINTENANCE 100-FOOT DIAMETER CARGO PARACHUTE SHAKEOUT AND AIRING 0007 00-1 THIS TAKS COVERS: Shakeout Airing INITIAL SETUP: Tools Broom (Item 2, WP 0050 00) Brush, Scrub, Household (Item 3, WP 0050 00) Fan, Pedestal (Item 5, WP 0050 00) Equipment Condition Parachute suspended or inflated. Personnel Required 92R (10) Parachute Rigger, As Required. SHAKEOUT A three-person or four-person team either indoors within a shakeout room or outdoors at a shakeout tower will accomplish the shakeout.  If facilities permit, shakeout will be accomplished by suspending the canopy as described in procedure 1., below.  If facilities do not permit canopy suspension, the canopy will be inflated and shakeout will be accomplished as described in procedure 2., below. 1.    Canopy suspension method.  Each parachute will be suspended by the canopy vent and all debris removed by shaking the canopy thoroughly or by brushing with a dry, soft-bristled brush as detailed below: a.    With assistance from No. 2 person, No. 1 person will connect snap on a pulley rope to canopy bridle loop. b.    Through use of a pulley rope, No. 1 and 2 personnel will raise canopy to a suitable height that will enable the No. 3 and 4 personnel to perform shakeout on each canopy gore.  Until gore shaking process is completed, No. 1 and 2 personnel will maintain a steady pull (or temporarily secure pulley rope) on pulley rope to hold suspended canopy at working height needed by the No. 3 and 4 personnel. Canopy Bridle Loop No. 2 Person No. 1 Person