Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2--16. Line 1 and 28/14 and 15 Checked at Connector Link
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2--15. Removing Twists from Suspension Lines
Up
TM-10-1670-279-23P Parachute Cargo Type: 22-Foot Diameter Cargo Extraction Parachute NSN 1670-01-063-3716 and NSN 1670-00-687-5408 Manual
Next
Figure 2-17.  Dressing the Apex

ARMY TM 10-1670-279--23&P AIR FORCE T.O. 13C5-27--2 NAVY NAVAIR 13-1-28 PIN: 066622--003 2--34 Change 3 2--16.  Packing 22-Foot Cargo Extraction Parachute (cont.) 2    Remove twist by rotating adapter web until lines are in proper location on connector links. (4) Check suspension lines for proper layout (figure 2-16). Lines 1 and 28 WILL BE inside of top connector links. Lines 14 and 15 WILL BE be outside bottom of connector links. (5) Parchute is now in proper layout. NOTE Before proceeding to pack the parchute (NSN 1670-00-687-5458), The type X extraction line should be inspected for damage. If the extraction line is damaged, the type X adapter web will be removed and a type XXVI adapter web will be installed. When this is accomplished, the NSN for the 22-foot-diameter cargo extraction parachute will be changed to 1670-01-063-3716. Figure 2--16. Line 1 and 28/14 and 15 Checked at Connector Link. g.. Attaching and Stowing Deployment Bag Retaining Tie.   Attach and stow retaining tie following the procedures in paragraph 2-8.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing