Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-5. Log Record Entries for Unit and Intermediate Repair and Inspection Data Page
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-4.  Log Record Entries for the Modification Work Order Compliance Record Page.
Up
TM-10-1670-279-23P Parachute Cargo Type: 22-Foot Diameter Cargo Extraction Parachute NSN 1670-01-063-3716 and NSN 1670-00-687-5408 Manual
Next
Checking Unpacked Equipment After Shipment

ARMY TM 10-1670-279-23&P AIR FORCE T.O.  13C5-27-2 NAVY NAVAIR 13-1-28 2-4.  Initial Receipt (cont). (c)   Modified by.  Enter last name of individual who has performed the modification.  If original log record for parachute has been lost, and it has been ascertained through inspection that a particular modification has been accomplished, entry for this column will be C/W "Complied With" (2, figure 2-4), which signifies applicable MWO has been complied with. (d)   Inspected by.  The individual who accomplished the inspection required after modification will sign this entry with his last name only. (e)   Unit.  Enter the unit designation responsible for performing the MWO or in the event of a lost Log Record, the unit to which the inspector is assigned. (f) Date.  Enter the day, month, and year the modification work was completed. (4) Unit and intermediate repair and inspection data.  When a parachute canopy assembly is initially received from a supply source and a technical/rigger-type inspection is performed, the inspection accomplishment will be documented on the "Unit and Intermediate Repair and Inspection Data" page of the individual Parachute Log Record (figure 2-5).  Additional entries will also be made on this page each time the canopy assembly is repaired or is administered an inspection in compliance with a one-time inspection Technical Bulletin (TB).  The page completion criteria is as follows: (a) Type of repair.  Enter the type of repair, completion of initial inspection, repair accomplishment, Technical Bulletin inspection compliance. (b) Inspection by.  The individual who accomplished the inspection required will sign this entry with last name. (c) Unit.  Enter the unit designation responsible for performing the type of repair. (d) Date.  Enter the day, month and year the repair was performed. Figure 2-5.  Log Record Entries for Unit and Intermediate Repair and Inspection Data Page. 2-6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing