Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Stowing the Suspension Lines
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure  2-25.  Stowing Canopy
Up
TM-10-1670-278-23P Parachute Cargo Type: 15-Foot Diameter Cargo Extraction Parachute NSN 1670-01-063-3715 and NSN 1670-00-062-1648 Manual
Next
Figure  2-26.  Stowing Suspension Lines

ARMY TM 10-1670-278-23&P AIR FORCE T.O. 13C5-26-2 NAVY NAVAIR 13-1-27 k. Stowing the Suspension Lines. NOTE When making suspension line stows insure stows do not exceed the width of the deployment bag. (1) Right of secured center bag tie loops, form a loop in suspension lines and make first suspension line stow at  upper  right  corner  of  deployment  bag  suspension  line  stowage  flap.    Secure  stow  with  the  previously installed retainer band (A, figure 2-26). (2) Extend suspension lines to upper left corner of stowage flap, form a loop in the suspension line and secure stow with previously installed retainer band. (3) Using procedures in (1) and (2) above, continue stowing suspension lines on stowage flap to a point within six  inches  of  suspension  line  connector  link  assemblies.    Make  last  stow  at  the  lower  right  side  of  the stowage flap (B, figure 2-26). l. Closing the Deployment Bag. (1) Position  suspension  line  connector  link  assemblies  back  on  top  of  stowed  suspension  lines  and  extend extraction  line  or  adapter  web,  as  applicable,  across  stowed  suspension  lines  to  upper  left  comer  of deployment bag (A, figure 2-27). (2) Fold right side of suspension line stowage flap over stowed suspension lines, fold left flap over right flap (B, figure 2-27). (3) Beginning at lower end of suspension line stowage flap, tightly roll flap into open end of deployment bag. Insure extraction line or adapter web extends from left side of deployment bag (figure 2-28). (4) Fold extended extraction line or adapter web from left to right across rolled suspension line stowage flap (figure 2-29). (5) Using a doubled length of thread, size 8/7 make left bag closing tie by passing one end of thread through left bottom bag closing loop from right to left, under extraction line or adapter web, as applicable, through top  bag  closing  loop  from  left  to  right,  secure  ends  together  over  extraction  line  or  adapter  web,  as applicable, with a surgeon's knot and a locking knot.  Trim tie ends to 2-inches. 2-41

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing