Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-24. Attaching Bridle Loop to Deployment Bag
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure  2-23.  Long Fold Complete
Up
TM-10-1670-278-23P Parachute Cargo Type: 15-Foot Diameter Cargo Extraction Parachute NSN 1670-01-063-3715 and NSN 1670-00-062-1648 Manual
Next
Figure  2-25.  Stowing Canopy

ARMY TM 10-1670-278-23&P AIR FORCE T.O. 13C5-26-2 NAVY NAVAIR 13-1-27 Figure  2-24.  Attaching Bridle Loop to Deployment Bag. (2) Beginning at upper right inside corner of deployment bag, stow canopy in the bag with 5-fold (A, figure 2- 25).  Upon completion of canopy stowage, suspension lines should extend from left side of the bag open end (B, figure 2-25). (3) Stand deployment bag upright with suspension lines routed from bag left side. (4) Using one turn single, thread, cotton, ticket no.  8/7 route thread through top and bottom center bag, tie loops  by  passing  thread  ends  through  tie  loop  from  right  to  left.    Fold  suspension  lines  from  left  to  right over skirt of canopy and routed thread.  Secure tie over the folded suspension lines with a surgeon's knot and a locking knot.  Trim tie ends to 2 inches (B, figure 2-25). Change 1     2-39

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing