Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Shakeout and Airing
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
General  Information
Up
TM-10-1670-278-23P Parachute Cargo Type: 15-Foot Diameter Cargo Extraction Parachute NSN 1670-01-063-3715 and NSN 1670-00-062-1648 Manual
Next
Prolonged exposure to direct sunlight will cause extensive damage to fabric materials

ARMY TM 10-1670-278-23&P AIR FORCE T.O. 13C5-26-2 NAVY NAVAIR 13-1-27 2-11. Shakeout and Airing. This task covers: a. Shakeout b. Airing Materials/Parts: Equipment Condition: Brush, Scrub, Household, Item 3, Appendix D. Parachute suspended Personnel Required: (2) 43E(10) Parachute Rigger a. Shakeout.  The shakeout will be accomplished by a two-person team, either indoors within a shakeout room or outdoors at a shakeout tower.  Each parachute will be suspended by the canopy bridle loop and all debris removed by shaking the canopy thoroughly or by brushing with a dry soft-bristled brush as detailed below: (1) With assistance from the No.  2 person, the No.  1 person will connect the snap on a pulley rope to the canopy bridle loop (A, figure 2-8). (2) Through use of the pulley rope, the No.  2 person will raise the canopy to a suitable height which will enable  the  No.    1  person  to  perform  shakeout  on  each  of  the  canopy  gores.    Until  the  gore  shaking process  is  completed  the  No.    2  person  will  maintain  a  steady  pull  on  the  pulley  rope  to  hold  the suspended canopy at the working height needed by the No.  1 person. (3) The No.  1 person will grasp any two consecutive suspension lines, one in each hand (B, figure 2-8), and vigorously shake the first gore.  When the gore is free of debris, the No. 1 person passes the line from the right hand to the left hand and grasps the next consecutive suspension line in the right hand.  The No.  1 person will shake out each consecutive gore until all suspension lines are held in the left hand and all gores are free of debris. (4) Once the gore shaking process is completed, the No.  2 person will slowly raise the suspended canopy higher as the No.  1 person clears the suspension lines of debris and removes entanglements (C, figure 2-8) when possible. (5) After  the  suspension  lines  have  been  cleared,  the  No.    2  person  may  hold  or  temporarily  secure  the pulley rope while the No.  1 person proceeds to clear debris from other parachute components. (6) When all components are free of debris, the No.  2 person will slowly lower the canopy while the No.  1 person   S-folds   the   suspension   lines   into   the   deployment   bag/kit   bag   (D,   figure   2-8).      After   the suspension lines have been completely folded, the No.  1 person will accordion-fold the canopy length on top of the folded lines. (7) As the canopy folding is being completed, the No.  1 person disconnects the canopy bridle loop from the pulley rope snap.  Secure the folded canopy assembly for further handling. 2-14

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing