Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: lnitial Receipt (cont)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-4.  Log Record Entries for the Modification Work Order Compliance Record Page
Up
TM-10-1670-278-23P Parachute Cargo Type: 15-Foot Diameter Cargo Extraction Parachute NSN 1670-01-063-3715 and NSN 1670-00-062-1648 Manual
Next
Receipt of Used Parachute

ARMY  TM  10-1670-278-23&P AIR  FORCE  T.O.  13C5-26-2 NAVY  NAVAIR  13-1-27 2-4. lnitial   Receipt   (cont). (c) Modified  by.  Enter  the  last  name  of  the  lndividual  who  has  performed  the  modificatlon.  If the  original  log  record  for  the  parachute  has  been  lost,  and  it  has  been  ascertained  through  inspection that  a  particular  modification  has  been  accomplished,  the  entry  for  this  column  will  be  C/W  "Complied With"  (2,  figure  2-4),  which  signifies  the  applicable  MWO  has  been  complied  with. (d) lnspected  by.  The  individual  who  accomplished  the  inspection  required  after modification will sign this entry with his last name only. (e) Unit.  Enter  the  unit  designation  responsible  for  performing  the  MWO  or  In  the  event  of  a lost  Log  Record,  the  unit  to  which  the  Inspector  is  assigned. (f) Date.  Enter  the  day,  month,  and  year  the  modification  work  was  completed. (4) Unit and intermediate repair and inspection data. When a parachute assembly is initially received from a supply source and a technical/rigger-type inspection is performed, the inspection accomplishment will be documented on the “Unit and Intermediate Repair and Inspection Data” page of the individual Parachute Log Record (figure 2-5). Additional entries will also be made on this page each time the assembly is repaired or is administered an inspection in compliance with a one-time inspection Technical Bulletin (TB). The page completion criteria is as follows: (a) Type  of  repair.  Enter  the  type  of  repair,  completion  of  initial  inspection,  repalr accomplishment,    Technical    Bulletin    inspection    compliance. (b) lnspection  by.   The  individual  who  accomplished  the  inspection  required  will  sign  this entry with last name. (c) Unit.  Enter  the  unit  designation  responsible  for  performing  the  type  of  repair. (d) Date. Enter the day, month and year the repair was performed. 2-6 1. 2. 3. COMPLETlON  OF  INITIAL  INSPECTION. REPAIR  ACCOMPLISHMENT. TECHNlCAL   BULLETIN   INSPECTION COMPLIANCE Figure  2-5.  Log  Record  Entries  for  Unit  and  Intermediate  Repair  and  inspection  Data  Page.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing