Next PACKING 28-FOOT CARGO EXTRACTION PARACHUTE CONT.
TM 10-1670-277-23&P 0011 00 0011 00-15 d. Rigger check number 5. 6. Closing the deployment bag. a. Position suspension line connector link assemblies on inside center top of deployment bag. Extend adapter web from left side. b. S-fold four feet of adapter web on top of the connector links. CAUTION Ensure that only four and a half feet of the adapter web extends from the deployment bag to prevent the attaching link assembly from striking the floor of the aircraft during extraction parachute deployment. c. Be sure adapter web extends four and a half feet from left side of deployment bag.