Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: UNIT MAINTENANCE 28-FOOT DIAMETER CARGO EXTRACTION PARACHUTE PACKING PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Equipment Immersed in Fresh-Water
Up
TM-10-1670-277-23P Parachute Cargo Type: 28-Foot Diameter Cargo Extraction Parachute Assembly NSN 1670-00-040-8135 Manual
Next
ORIENTATION

TM 10-1670-277-23&P                                                       0011 00 UNIT MAINTENANCE 28-FOOT DIAMETER CARGO EXTRACTION PARACHUTE PACKING PROCEDURES 0011 00-1 THIS TASK COVERS:   Inspection   Orientation   Preparing Parachute for Proper Layout   Removing Inversions   Locating Suspension Lines   Packing the 28-Foot Cargo Extraction Parachute   Packing the 28-Foot Cargo Extraction Parachute for Dual Row Airdrop Tools Needle, Tacking (Item 10, WP 0056 00) Knife (Item 5, WP 0056 00) Paddle, Packing (Item 11, WP 0056 00) Screwdriver, Cross-Tip (Item 14, WP 0056 00) Separator, Line (Item 16, WP 0056 00) Weights, Packing (Item 25, WP 0056 00) Materials/Parts Band, Retainer, Rubber (Item 1, WP 0065 00) Cord, Nylon, Type V (Item 8, WP 0065 00) Tape, Pressure Sensitive (Item 21, WP 0065 00) Thread, Cotton, Ticket 8/7 (Item 23, WP 0065 00) Webbing, Cotton, Type I, ¼-IN. (Item 35, WP 0065 00) Webbing, Textile, Nylon, Tubular, ½-IN. (Item 43, WP 0065 00) Personnel Required Two, 92R (10) Parachute Rigger Two, 92R (20) Parachute Rigger Equipment Condition Parachute cleaned (WP 0008 00) and given a shakeout (WP 0007 00). References DA PAM 738-751 WP 0003 00, WP 0004 00, WP 0007 00, WP 0008 00, WP 0009 00, WP 0054 00 WARNING Failure to detect areas of damage may result in malfunction of the parachute, or loss of equipment. INSPECTION If defects or damages are discovered during inspection of a parachute, the parachute must be rigger-rolled and processed for maintenance in accordance with ACCORDION FOLDING/RIGGER ROLLING procedures (WP 0054 00).  A technical/rigger type inspection and a pack-in-process inspection must be performed in conjunction with the packing of each parachute (refer to WP 0009 00). 1.    Technical/Rigger Type Inspection.  During the packing of the parachute, it must be given a technical/rigger-type inspection by the packer in accordance with WP 0009 00 detailed above. 2.    Pack-In-Process Inspection.  A designated supervisory rigger, other than the packer, must perform a pack-in process inspection at seven intervals during the packing procedure.  The inspection is performed to assure that the parachute is packed according to authorized packing procedures (refer to WP 0009 00).

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing