Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: UNIT MAINTENANCE 28-FOOT DIAMETER CARGO EXTRACTION PARACHUTE INSPECTION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
RINSING EQUIPMENT IMMERSED IN FRESH-WATER
Up
TM-10-1670-277-23P Parachute Cargo Type: 28-Foot Diameter Cargo Extraction Parachute Assembly NSN 1670-00-040-8135 Manual
Next
TECHNICAL/RIGGER-TYPE INSPECTION PROCEDURES

TM 10-1670-277-23&P                                                       0009 00 UNIT MAINTENANCE 28-FOOT DIAMETER CARGO EXTRACTION PARACHUTE INSPECTION 0009 00-1 THIS TAKS COVERS:   Routine   Pack-In-Process   Technical/Rigger-Type   In-Storage   Equipment Disposition INITIAL SETUP: Equipment Condition Laid out on packing table or other suitable surface. Personnel Required Two, 92R (10) Parachute Rigger References DA PAM 738-751; TB 43-002-43;   DA PAM 738-750; AR 750-1; WP 0003 00;   WP 0010 00; WPs 005600 and 0057 00 NOTE For Army personnel, the In-Process Inspector (IP) qualifications will be IAW AR 750-32. ROUTINE INSPECTION A routine inspection is a visual check performed to ascertain the serviceability of all visible components of a parachute that is packed or rigged for use.  The inspection will be made on all components that can be inspected without opening the parachute pack.  Prior to use, a parachute rigger will administer this inspection.   Parachutes issued for an airdrop operation, and not deployed, will receive a routine inspection prior to being placed into a ready-for-issue storage. PACK-IN-PROCESS INSPECTION A pack-in-process inspection is performed at specified intervals during the packing of a parachute to ensure that only authorized procedures and methods are being used.  A parachute rigger, other than the packer or rigger preparing the applicable equipment for use, will accomplish the inspection.  The intervals at which the inspection is performed is as follows: 1.    After the parachute is placed in proper layout. 2.    After gores are folded and flatfold is completed. 3.    After canopy is longfolded. 4.    After canopy is stowed. 5.    After suspension lines are stowed. 6.    After closing the deployment bag. 7.    After parachute is completely packed.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing