Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-16. Attaching Deployment Bag with Breakcord
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-15.  Suspension Line Separation
Up
TM-10-1670-275-23P Parachute Cargo Type: 12-Foot Diameter High-Velocity Cargo Parachute NSN 1670-00-788-8888 Manual
Next
Figure 2-17.  Surgeon's Knot

ARMY TM 10-1670-275-23&P AIR FORCE TO 13C5-25-2 NAVY NAVAIR 13-1-26 (a)  Attaching deployment bag with breakcord. 1  Cut a 15 inch-long piece of ticket 8/7 thread, for use as breakcord. 2  Position deployment bag attaching loop (located on inside of bag) adjacent to canopy bridle loop (figure 2-16). 3  Pass one end of breakcord through bridle loop and pull through until center of breakcord length is reached.  Pull both ends of centered breakcord taut. 4    Working   from   opposite   directions,   pass   each   end   of   breakcord   through   deployment   bag attaching loop. 5  Pull two ends of breakcord taut (figure 2-16).  Secure two ends over deployment bag attaching loop with a surgeon's knot and locking knot (figure 2-17).  Trim end to two inches. 4706-010 Figure 2-16.  Attaching Deployment Bag with Breakcord. 2-31

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing