Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Inspection
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Cleaning Drying (cont)
Up
TM-10-1670-275-23P Parachute Cargo Type: 12-Foot Diameter High-Velocity Cargo Parachute NSN 1670-00-788-8888 Manual
Next
Inspection (cont)

ARMY TM 10-1670-275-23&P AIR FORCE TO 13C5-25-2 NAVY NAVAIR 13-1-26 2-13.  Inspection. This task covers: a.  Routine d.  In-storage b.  Pack-in-Process e.  Equipment Disposition c  Technical/Rigger-Type Personnel Required: Equipment Condition. 43E(10) Parachute Rigger Packed/Unpacked a.  Routine Inspection.  A routine Inspection is a visual check performed to ascertain the service- ability of all visible components of a parachute that Is packed or rigged for use.  The inspection will be made on all components that can be Inspected without opening the parachute pack.  This Inspection will be administered by a parachute rigger prior to issue.  Parachutes issued for an air delivery operation and not deployed will receive a routine inspection prior to being placed into ready-for-issue storage. b.   Pack-in-Process Inspection.  A pack-in-process Inspection is performed at specified intervals during the  packing  of  a  parachute  to  insure  that  only  authorized  procedures  and  methods  are  being  used.    The Inspection will be accomplished by a parachute rigger other than the packer or rigger preparing the applicable equipment for use.  The intervals at which the inspection is performed is as follows: (1)  After parachute is placed in proper layout. (2)  After gores are folded and flatfold is completed. (3)  After canopy is longfolded. (4)  After suspension lines are stowed. (5)  After canopy is stowed. (6)  After parachute is completely packed. c. Technical/Rigger-Type Inspection Procedures. (1)  Overall Inspection.  An overall inspection will be made on the 12-foot high-velocity cargo parachute to ascertain the following. (a)  Log record/parachute inspection data pocket and form.  As applicable, inspect assembly log record/parachute inspection data pocket to insure the Army Parachute Log Record (DA Form 10-42 or 3912) is enclosed and properly attached as prescribed in paragraph 2-4e Further, remove log record from pocket and evaluate recorded entries to insure compliance with paragraph 2-4e. (b)  Assembly completeness.  Insure that applicable assembly is complete and no components or parts are missing. 2-17

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing