Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Shakeout and Airing
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
General Information (cont)
Up
TM-10-1670-275-23P Parachute Cargo Type: 12-Foot Diameter High-Velocity Cargo Parachute NSN 1670-00-788-8888 Manual
Next
Figure 2-7 .  Shakeout

ARMY TM 10-1670-275-23&P AIR FORCE TO 13C5-25-2 NAVY NAVAIR 13-1-26 2-11.   Shakeout and Airing. This task covers: a. Shakeout b. Airing Materials/Parts Equipment Condition' Brush, scrub, household, Item 3, Appendix D Parachute Suspended Personnel Required:  (2) 43E(10) Parachute Rigger a.  Shakeout.  The shakeout will be accomplished by a two-person team, either indoors within a shakeout room or outdoors at a shakeout tower.  Each parachute will be suspended by the canopy vent and all debris removed by shaking the canopy thoroughly or by brushing with a dry soft-bristled brush as detailed below: (1)  With assistance from no 2 person, no 1 person will connect snap on a pulley rope to canopy bridle loop (A, figure 2-7). (2)  Through use of pulley rope, no.  2 person will raise canopy to a suitable height which will enable no 1 person to perform shakeout on each of canopy gores.  Until gore shaking process Is completed no 2 person will maintain a steady pull on pulley rope to hold suspended canopy at working height needed by no 1 person. (3)  No.  1 person will grasp any two consecutive suspension lines, one in each hand (B, figure 2-7), and vigorously shake first gore.  When gore is free of debris, no 1 person passes line from right hand to left hand and grasps next consecutive suspension line in right hand no.  1 person will shake out each consecutive gore until all suspension lines are held in left hand and all gores are free of debris. (4)  Once gore shaking process is completed, no 2 person will slowly raise suspended canopy higher as no.    1  person  clears  suspension  lines  of  debris  and  removes  entanglements  (C,  figure  2-7)  when possible. (5)  After suspension lines have been cleared, no. 2 person may hold or temporarily secure pulley rope while  no  1  person  proceeds  to  clear  debris  from  other  parachute  components  such  as  risers  or deployment bag. (6)  When all components are free of debris, no.  2 person will slowly lower canopy while no.  1 person S- folds  suspension  lines  into  deployment  bag  (D,  figure  2-7).    After  suspension  lines  have  been completely folded, no.  1 person will accordion-fold canopy length on top of folded lines. (7)  As canopy folding Is being completed, no 1 person disconnects canopy vent from pulley rope snap Secure folded canopy assembly for further handling. 2-11

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing