|
| |
Back Rinsing Parachute Assembly Immersed in Fresh-Water | Up TM-10-1670-272-23P Parachute Personnel Type: 35-Foot Diameter MC1-1B Troop Back Parachute Assembly NSN 1670-00-598-0751 Manual | Next UNIT MAINTENANCE MC1-1B/MC1-1E TROOP BACK PARACHUTE ASSEMBLY PACKING PROCEDURES CONT. |
TM 10-1670-272-23&P 0011 00
UNIT MAINTENANCE
MC1-1B/MC1-1E TROOP BACK PARACHUTE ASSEMBLY
PACKING PROCEDURES
0011 00-1
THIS TASK COVERS:
·
Inspection
·
Orientation
·
Preparing Parachute for Proper Layout
·
Removing Tangles and Twists from Apex
Lines
·
Removing Inversion
·
Removing Turns, Tangles/Twists From
Suspension Lines
·
Folding the Gores
·
Longfolding the Canopy
·
Tying Static Line to Bridle Loop of Canopy
·
Stowing the Canopy
·
Closing Deployment Bag and Stowing
Suspension Lines
·
Tying Connector Links and Suspension Line
Protective Cover
·
Closing the Pack Tray
·
Stowing the Static Line
·
Army Parachute Log Record
·
Static Line Extensions
·
Folding the Harness
INITIAL SETUP:
Tools
Knife (Item 13, WP 0043 00)
Line Separator (Item 16, WP 0043 00)
Packing Paddle (Item 20, WP 0043 00)
Plate, Tension (Item 22, WP 0043 00)
Packing Weights (Item 21, WP 0043 00)
Stow Hook (Item 29, WP 0043 00)
Materials/Parts
Band, Rubber Retainer (Item 1, WP 0056 00)
Webbing, Textile, Cotton, Type I, ¼-in. (Item 62,
WP 0056 00)
Tape, Masking, 2-in. (Item 44, WP 0056 00)
Personnel Required
92R(10) Parachute Rigger
Equipment Condition
Parachute cleaned (WP 0008 00)
and given a shakeout (WP 0007 00).
References
TM 10-1670-201-23/
T.O. 13C-1-41/NAVAIR 13-1-17
DA PAM 738-751; TB 43-0002-43;
WP 0004 00; WP 0009 00;
WP 0041 00
WARNING
Failure to detect areas of damage may result in malfunction of the
parachute and injury, or loss of life, to personnel.
NOTE
The parachute shall be repacked every 120 days.
INSPECTION
If defects or damages are discovered during inspection of a parachute, the parachute must be rigger-
rolled and processed for maintenance, in accordance with Accordion Folding/Rigger Rolling procedures
(WP 0042 00). A technical/rigger-type inspection and a pack-in-process inspection must be performed in
conjunction with the packing of each parachute (refer to WP 0009 00).
|