Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-37. Deployment Bag Prepared for Stowing of Canopy
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-36.  Longfold Completed
Up
TM-10-1670-271-23P Parachute Personnel Type: 35-Foot Diameter T-10B Troop Back Parachute Assembly NSN 1670-00-091-0720 Manual
Next
Figure 2-38.  Tying Static Line Loop to Bridle Loop

ARMY TM 10-1670-271-23&P AIR FORCE TO 14D1-2-464-2 MARINE CORPS TM 01136B-23&P/1 2-16.  PACKING THE T-10B PARACHUTE (CONT). i.  Tying Breakcord.  Before stowing the canopy in the deployment bag, the canopy must be attached at the bridle loop to the static line loop.  Proceed as follows: Warning Inspect  deployment  bag  and  entire  static  line  including  that  portion  under sleeve. (1)  To secure the static line while stowing the canopy, S-fold the static line and roll the suspension line protector flap around the folded line.  Secure ends of the protector flap with rubber retainer bands (see detail A, figure 2-37). (2)    Double  36-inch  length  of  Type  1,  1/4-inch  cotton  webbing,  and  pass  one  end  of  doubled  webbing through the loop in the end of the static line, through bridle loop of the canopy, and back through loop In the end of the static line. NOTE Packing  paddle  may  be  used  to  aid  In  tying  the  breakcord  tie.    Remove  the packing paddle after completing the tie. Figure 2-37.  Deployment Bag Prepared for Stowing of Canopy. Change 2 2-50

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing