Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-18. Dressing Apex
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-17.  Parachute in Proper Layout
Up
TM-10-1670-271-23P Parachute Personnel Type: 35-Foot Diameter T-10B Troop Back Parachute Assembly NSN 1670-00-091-0720 Manual
Next
Figure 2-20.  Folding First Gore of Right Group

ARMY TM 10-1670-271-23&P AIR FORCE TO 14D1-2-464-2 MARINE CORPS TM 01136B-23&P/1 Figure 2-18.  Dressing Apex. (2)  Move to the lower lateral band of the canopy with the right group of lines in the left hand.  Lift right group  of  suspension  lines  with  the  left  hand  at  the  anti-inversion  net.    Hold  top  center  gores  in position with the right hand, and flip right group of gores over left group (figure 2-19). (3)  Start with line number 16 in the right hand.  Pick up line 17 with the left hand and lift straight up until slack is removed from the lower lateral band.  With a smooth continuous movement bring the left hand over the head.  When gore inflates, place line 17 on top of line 16.  Make certain the V-tabs are facing down (figure 2-20) and that the gore material folds to the right side. (4)  Continue folding gores until you reach line no 30. (5)  Hold the right group of lines with the left hand. With the right hand, fingers pointing down, scissor the right group of lines between the 1st and 2nd fingers (figure 2-21). (6)  Rotate this group of lines clockwise until the fingers are tilted slightly upward, so that line 30 is on the bottom and line 16 is on the top (figure 2-22). (7)    Starting  with  line  1,  fold  the  left  group  of  gores  using  the  same  movement  as  in  step  (3),  above. Continue folding the gores until you reach suspension line no. 14.  Raise suspension line no 15 and drape the last gore on the left and the next to last gore on the right (figure 2-23). 2-35

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing