Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Packing theT-10B Parachute
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Salt-Water Contamination Test
Up
TM-10-1670-271-23P Parachute Personnel Type: 35-Foot Diameter T-10B Troop Back Parachute Assembly NSN 1670-00-091-0720 Manual
Next
Packing theT-10B Parachute CONT.

ARMY TM 10-1670-271-23&P AIR FORCE TO 14D1-2-464-2 MARINE CORPS TM 01136B-23&P/1 2-16.  Packing theT-10B Parachute. This task covers a Inspection j. Stowing the Canopy b Orientation k Closing Deployment Bag and Stowing c. Preparing Parachute for Proper Suspension Lines Layout l. Tying Connector Links and Suspension Line d Removing Tangles and Twists from Protective Cover Apex Lines m Closing the Pack Tray e Removing Inversion n. Stowing the Static Line f. Locating Suspension Lines o. Army Parachute Log Record g Folding the Gores p. Static Line Extension h Long folding the Canopy q. Folding the Harness i. Tying the Break cord Tools. Equipment Condition: Packing Weights, Item 21, Appendix B Parachute cleaned (reference paragraph 2-12) Line Separator, Item 16, Appendix B and given a shakeout (reference Packing Paddle, Item 20, Appendix B paragraph 2-11). Knife, Item 13, Appendix B Stow Hooks, Item 29, Appendix B References' Plate, Tension, Item 21A, Appendix B TM 10-1670-201-23 T O. 13C-1-41/ Materials/Parts NAVAIR 13-1-17 TB 43-0002-4 (will be superseded by TB 750-126 TB 43-0002-43) Retainer Band, Rubber, Item 1, Appendix D Webbing, Cotton, Type I, 1/4-in , Item 58, Appendix D Tape Adhesive, 2-in., Item 43A, Appendix D Personnel Required. 43E(10) Parachute Rigger WARNING Failure to detect areas of damage may result in malfunction of the parachute and injury or loss of life to personnel. a.    Inspection.    If  defects  or  damages  are  discovered  during  Inspection  of  a  parachute,  the  parachute must be rigger-rolled and processed for maintenance in accordance with paragraph 2-38 and TB 750-126.  A technical/ rigger-type inspection and a pack-in-process inspection must be performed In conjunction with each packing of a parachute (refer to paragraph 2-13 above). (1)  Technical/rigger-type inspection Before each parachute is packed for air delivery, it must be given a technical/rigger-type inspection by the packer in accordance with paragraph 2-13. 2-26 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing