Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: UNIT MAINTENANCE 24-FOOT DIAMETER TROOP CHEST RESERVE (T-10R) PARACHUTE AND THE MIRPS SHAKEOUT AND AIRING
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
CHAPTER 3 UNIT MAINTENANCE INSTRUCTIONS   FOR PARACHUTE, PERSONNEL TYPE: 24-FOOT DIAMETER, TROOP, CHEST, RESERVE (T-10R) AND THE MODIFIED IMPROVED RESERVE PARACHUTE SYSTEM (MIRPS)
Up
TM-10-1670-269-23P Parachute Personnel Type: 24-Foot Diameter Troop Chest Reserve (T-10R) NSN 1670-00-892-4218 Manual
Next
UNIT MAINTENANCE 24-FOOT DIAMETER TROOP CHEST RESERVE (T-10R) PARACHUTE AND THE MIRPS SHAKEOUT AND AIRING CONT.

TM 10-1670-269-23&P    0008 00 0008 00-1 UNIT MAINTENANCE 24-FOOT DIAMETER TROOP CHEST RESERVE (T-10R) PARACHUTE AND THE MIRPS SHAKEOUT AND AIRING THIS TASK COVERS: Shakeout Airing INITIAL SETUP: Tools Brush, Scrub, Household (Item 3, WP 0044 00) Equipment Condition Parachute suspended. Personnel Required Two, 92R (10) Parachute Rigger SHAKEOUT The shakeout will be accomplished by a two-or three-person team either indoors within a shakeout room or outdoors at a shakeout tower.  Each parachute will be suspended by the canopy vent and all debris removed by shaking the canopy thoroughly or by brushing with a dry, soft-bristled brush as detailed below:   1.    With assistance from the no. 2 person, no. 1 person will connect the snap on a pulley rope to canopy apex lines. 2.    Through use of the pulley rope, no. 2 person will raise the canopy to a suitable height, which will enable the no. 1 person to perform shakeout on each of the canopy gores.  Until the gore shaking process is completed, the no. 2 person will maintain a steady pull on the pulley rope to hold the suspended canopy at working height needed by the no. 1 person. No. 1 Person Snap No. 2 Person Bridle Line

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing