Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Drop-Testing Criteria
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
24-FOOT DIAMETER TROOP CHEST RESERVE (T-10R) PARACHUTE AND THE MIRPS PREVENTIVE MAINTENANCE CEHCKS AND SERVICES (PMCS), INTRODUCTION
Up
TM-10-1670-269-23P Parachute Personnel Type: 24-Foot Diameter Troop Chest Reserve (T-10R) NSN 1670-00-892-4218 Manual
Next
24-FOOT DIAMETER TROOP CHEST RESERVE (T-10R) PARACHUTE AND THE MIRPS PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)

TM 10-1670-269-23&P    0006 00 0006 00-2 The T-10R and the MIRPS will be repacked at a 120-day interval in climatic category 7 and 8 (see note). NOTE The MIRPS requires a minimum ripcord pull test IAW WP 0031 00. Drop-Testing Criteria.  Drop testing of the T-10R and MIRPS consist of physically airdropping the item from an aircraft in flight.  The drop test is used as a means of providing the serviceability of an item or checking parachute rigger proficiency and will only be performed under the supervision of qualified parachute rigger personnel who satisfy the supervisory requirements outlined in AR 750-32.  Drop-testing usually will be conducted by an activity responsible for the inspection and maintenance of airdrop equipment.  The criteria required to accomplish a drop test is as follows: 1.    A reserve personnel parachute will be drop-tested through use of dummy only. 2.    When drop-testing the reserve personnel parachute, the weight of the dummy will be proportionate with the standard design load.  In addition, the drop test will be conducted under conditions, which are consistent with the requirements for a personnel jump. 3.    During the drop test the deployment of the parachute will be thoroughly monitored and observed to detect any indication of malfunction or defect. A subsequent record of the drop test will be entered into the log record book. 4.    Any reserve parachute that indicates any evidence of malfunction or defect during or after a drop test will be disposed of as prescribed in WP 0010 00. 5.    A reserve parachute that does not reflect evidence of malfunction or defect upon completion of a drop test will be administered a technical/rigger-type inspection as outlined in WP 0010 00.  If serviceable, the item may remain in use. END OF WORK PACKAGE

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing