Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: RECEIPT OF USED PARACHUTE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
27- POUND MAXIMUM RIPCORD PULL TEST (T-10R and MIRPS)
Up
TM-10-1670-269-23P Parachute Personnel Type: 24-Foot Diameter Troop Chest Reserve (T-10R) NSN 1670-00-892-4218 Manual
Next
24-FOOT DIAMETER TROOP CHEST RESERVE (T-10R) PARACHUTE AND THE MIRPS ASSEMBLING THE T-10R AND THE MIRPS PARACHUTE

TM 10-1670-269-23&P    0004 00 0004 00-10 6.    If the pack tray is used and a new T-10R or MIRPS ripcord grip pocket was applied, verify the application procedures in WP 0029 00.  If applied correctly, submit a PQDR for the new ripcord grip pocket and ripcord grip. 7.    If the MIRPS passes the 7-pound minimum and the T-10R and the MIRPS passes the 27-pound maximum ripcord pull test, repack the T-10R IAW WP 0012 00 and the MIRPS IAW WP 0013 00. 8.    Annotation completion of this test (test conducted, name of tester, date completed) on the notes page of the parachute log record book (DA Form 3912), or applicable location in the NAVWPNCEN or NAVWPNS CL 13512/11 (Parachute History Record). RECEIPT OF USED PARACHUTE Upon initial receipt of used parachute, proceed as follows: 1.    Follow procedures given in this WP and check each component for excessive wear and tear. 2.    If defects or damages are discovered, process the parachute for maintenance at the maintenance level assigned by the Maintenance Allocation Chart (WP 0044 00). AFTER-USE RECEIPT When parachute is received at the maintenance activity following its use during air delivery, it must be given a shakeout and aired (WP 0008 00), and, if necessary, cleaned (WP 0009 00) before it can be returned to service.  If a parachute is issued but not used, it does not need to be given a shakeout; however, it must be aired if it has been subjected to conditions of dampness. CHECKING UNPACKED EQUIPMENT AFTER SHIPMENT Inspect equipment for damage incurred during shipment.  If the equipment has been damaged, report the damage on SF Form 364, Supply Discrepancy Report (SDR).    Check the equipment against the packing slip to see if the shipment is complete.  Report all discrepancies in accordance with the instructions in DA PAM 738-750. Check to see whether the equipment has been modified. END OF WORK PACKAGE

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing