Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Unit and Direct Support Repair and Inspection Date
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Inside Back Cover
Up
TM-10-1670-269-23P Parachute Personnel Type: 24-Foot Diameter Troop Chest Reserve (T-10R) NSN 1670-00-892-4218 Manual
Next
Replacing a Filled Put or Unserviceable Log Record

TM 10-1670-269-23&P    0004 00 0004 00-6 k.    Inspected By.  The individual who accomplished the inspection required after modification will sign this entry with last name only. l. Unit.  Enter the unit designation responsible for performing the MWO or in the event of a lost Log Record, the unit to which the inspector is assigned. m.   Date.  Enter the day, month, and year the modification work was completed. 4.    Unit and Direct Support Repair and Inspection Date.  When a parachute canopy assembly is initially receive from a supply source and a technical/rigger-type inspection is performed, the inspection accomplishment will be documented on the “Unit and Direct Support Maintenance Repair and Inspection Data” page of the individual Parachute Log Record.  Additional entries will also be made on this page each time the canopy assembly is repaired or is administered an inspection in compliance with a Maintenance Advisory Message (MAM), a Ground Precautionary Message (GPM) or a Safety of Use Message (SOUM).  The page completion criteria is as follows: UNIT & INTERMEDIATE TYPE OF REPAIR UNIT DATE DAY MONTH YEAR REPAIR & INSPECTION DATA INSP BY MAM 01-02 Completed a.    Type of Repair.  Enter the type of repair, completion of initial inspection, repair accomplishment, or GPM, MAM or SOUM Inspection compliance. b.    Inspection By.  The individual who accomplished the inspection required will sign this entry with last name. c.    Unit.  Enter the unit designation responsible for performing the type of repair. d.    Date.  Enter the day, month, and year the repair was performed. 1. Completion of Initial Inspection 2. Repair Accomplishment 3. Maintenance Advisory Message 1 2 3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing