Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Procedures to Check for Platform Bowing
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Completing Assembly Procedure
Up
TM-10-1670-268-20P The Type V Airdrop Platform and Dual Airdrop Platform Manual
Next
Installation of Outrigger Masts

                                                                   TM 10-1670-268-20&P                                            0004 00 0004 00-24 4.    Procedures to Check for Platform Bowing (2 options). NOTE Identify a flat, smooth, clean area.  Each 18-foot dual row platform should be checked for signs of bowing just before the load is rigged on it.  The following two tests must be performed on a level floor space large enough to accommodate the Dual Row, 18-foot platform.  There are two ways to check the platform for bowing using either one or three personnel.  Check both sides of platform. a.    Three personnel are required for this task (option 1).  Check platform for bowing as follows: (1) First person stands beside the platform at one end and holds an end of an 18-foot length of 8/7 cotton thread to the top corner of the outer edge of the side rail. (2)    Second person stands beside the platform at the opposite end, and holds the cotton thread so that it is stretched taut between the two top corners of the outer edge of the side rail. (3)    Using measuring tape, third person measures the widest distance between the cotton thread and the top of side rail. (4)    Platform is considered usable if the distance is ¼-inch or less. b.    One person is required for this task (option 2).  Check platform for bowing as follows: (1)     Using measuring tape, measure greatest distance between surface of level floor space and lower edge of rail, at each end of platform and in the center. (2)     Platform is considered usable if the distance is a ¼-in or less. 5.    Installation of Outrigger Masts.  Two personnel are required for this task. a.    Install the outrigger mast onto the previously assembled weldment/link in a horizontal position.   Each mast can be installed to either side of the platform.  Position mast so that handle is up and farthest away from platform. OUTRIGGER MAST ASSEMBLY HANDLE

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing