|
| |
Back Installation of Outrigger Weldment Assembly | Up TM-10-1670-268-20P The Type V Airdrop Platform and Dual Airdrop Platform Manual | Next Procedures to Check for Platform Bowing |
TM 10-1670-268-20&P 0004 00
0004 00-23
(4)
Reposition weldment if necessary. Install bolt and washer from the underside of the
platform. Thread a 3/8-inch nut onto bolt by hand. Repeat for remaining bolt-holes on
weldment.
g. Completing Assembly Procedure.
(a) Using a ¾-inch socket or wrench, tighten the weldment to the link.
(b) Using a 9/16-inch socket or wrench, tighten the weldment to the platform panel.
WELDMENT
SECURED TO
LINK
WELDMENT
SECURED TO
PLATFORM
PANEL
|